Enbridge Pipelines (FSP) L.L.C. [Flanagan South] Tariffs



The following tariffs are regulated by the Federal Energy Regulatory Commission (FERC).

Pending Tariffs

Tariff
FERC 4.14.0
Cancels
FERC 4.13.0

Description: Joint Rates

Entity/Entities: Flanagan South & Lakehead

Product Type: Crude Petroleum

Issuance Date: February 27, 2020

Effective Date: April 1, 2020

Current Tariffs

Tariff
FERC 1.7.0
Cancels
FERC 1.6.0

Description: Rules & Regulations

Entity/Entities: Flanagan South

Product Type: Crude Petroleum

Issuance Date: February 27, 2019

Effective Date: April 1, 2019

Tariff
FERC 2.7.0
Cancels
FERC 2.6.0

Description: Local Rates

Entity/Entities: Flanagan South

Product Type: Crude Petroleum

Issuance Date: May 31, 2019

Effective Date: July 1, 2019

Tariff
FERC 4.13.0
Cancels
FERC 4.12.0

Description: Joint Rates

Entity/Entities: Flanagan South & Lakehead

Product Type: Crude Petroleum

Issuance Date: November 27, 2019

Effective Date: December 1, 2019

Tariff
FERC 3.20.0 (CER 462)
Cancels
FERC 3.19.0 (CER 456)

Description: International Joint Rates

Entity/Entities: Flanagan South, Canadian Mainline & Lakehead

Product Type: Crude Petroleum

Issuance Date: November 29, 2019

Effective Date: January 1, 2020

Download Index of Tariffs

Published Date: January 31, 2020

Choose from the following options:


Other Related Procedures

Practice Applicable to Automatic Balancing
Effective: April 1, 2019

Schedules to Practice Applicable to Automatic Balancing
Effective: September 1, 2019

FSP Batch Supply Verification Procedure
Effective: July 1, 2018

Contact

For questions regarding Enbridge Pipelines (FSP) L.L.C. tariffs, please contact enbridge-tariffs@enbridge.com.